12–13 May 2025
Elettra-Sincrotrone Trieste
Europe/Rome timezone

Discussion Trigger: Comparison of Different Bunch Charge Monitors used at the ARES Accelerator at DESY

12 May 2025, 12:00
30m
Elettra-Sincrotrone Trieste

Elettra-Sincrotrone Trieste

Strada Statale 14 - km 163,5 in AREA Science Park 34149 Basovizza, Trieste ITALY
Discussion trigger Session 2

Speaker

Timmy Lensch (Deutsches Elektronen Synchrotron DESY)

Description

The ARES (Accelerator Research Experiment at SINBAD) is a conventional S-band linear RF accelerator allowing the production of low charge ultra-short electron bunches within a range of currently 0.01 pC to 250 pC. The R&D accelerator also hosts various experiments. Different types of charge monitors are installed along the 45m long machine: A new Faraday Cup design had been simulated and realized. Two Beam Charge Transfomers (Toroids) are installed. Both, Faraday Cup and Toroids are calibrated independently with laboratory setups. At the end of the accelerator a Bergoz Turbo-ICT (in vaccum) and an in-air ICT are installed. This presentation will give an overview of the measured linearity and the deviations found at the Toroid measurement.

Author

Timmy Lensch (Deutsches Elektronen Synchrotron DESY)

Presentation materials